negative marking pmp exam

Many aspirants think that there is negative marking on the PMP exam. Please note, there is no penalty for selecting a wrong answer.

Therefore, never leave any questions unmarked, even if you don’t know the correct answer. If you don’t know the right answer, select your best guess.

Leaving a question blank will not give you any marks. However, if you answer any question, you don’t know the answer to, you have at least a 25% chance of being correct.

If you are having a problem making best guesses, try eliminating the options that are the least likely answer. If you can delete one such option, you will have a 33% of selecting the correct answer, and if you eliminate two, you will have a 50% chance of choosing right.

Therefore, answer all the questions even if you are not sure about the answers to some of them.

Summary

There is no negative marking in the PMP exam, so you should not worry about selecting a wrong answer. Firstly, complete all the questions that you can and then you can revisit any unanswered questions. Now try to eliminate the least likely answers and then select the one that is most likely to be correct.

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, this PMP Question Bank has helped over 10,000 PMP aspirants pass the PMP exam. 

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details

PMP Formula Guide

This is the most popular Formula Guide for the PMP Exam. If you face difficulty with attempting mathematical questions for the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details


Recommended Reading


Speak Your Mind

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}

Recommended Resources

Use these resources for your PMP certification exam preparation and pass the exam with minimal effort.

__CONFIG_group_edit__{"jv80vv8f":{"name":"All Image(s)","singular":"-- Image %s"},"jv812jsg":{"name":"All Title(s)","singular":"-- Text %s"},"jv812qp8":{"name":"All Name(s)","singular":"-- Text %s"},"jv812zdt":{"name":"All Divider(s)","singular":"-- Divider %s"},"jv813402":{"name":"All Paragraph(s)","singular":"-- Text %s"},"jv813af5":{"name":"All Button(s)","singular":"-- Button %s"},"jv813f5t":{"name":"All Content Box(s)","singular":"-- Content Box %s"},"jv813k1c":{"name":"All Column(s)","singular":"-- Column %s"}}__CONFIG_group_edit__
__CONFIG_local_colors__{"colors":{"c85e2":"Button ","f242c":"Border"},"gradients":{}}__CONFIG_local_colors__

The PMP Training Program


The PMI approved 35 contact hours training program that is 100% online, affordable, and help you prepare the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
Read More

The PMP Exam Preparation Tool


A PMP exam preparation course, that is 100% online and provide you everything you need to pass the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
Read More
>