PMP Question Bank Updated Version 3.0

The PMP Question Bank was launched in 2013, and since then it has been updated countless times as per the feedback received from successful exam takers. This is the third major update of the PMP Question Bank.

This Question Bank originally had 200 PMP exam sample questions, and in the first update, I added 200 more and inserted hyperlinks so readers could easily flip to the answers and then back to the questions.

The second major update was in January 2016 when the PMI updated the PMP Exam Content Outline after conducting a role delineation study. I replaced over 100 questions.

This is the third major update. I have replaced or updated over 150 questions. Easier and one-line questions have been removed, and more challenging questions were added. These questions are designed to help increase your analytical reasoning.

If you can solve over 70% in this Question Bank, I am sure that you will pass the real exam.

I rewrote the explanations for many questions to bring more clarity and comprehensiveness.

These updates have made this Question Bank the best of its kind and you will love it.

Click here for more details

If you are considering whether to buy it now or wait for a new version of the PMBOK Guide to arrive, I suggest you buy it now.

I guarantee that when the new version of the PMBOK Guide arrives and the exam content changes, I will update this Question Bank and send it to you for free.

If you have bought the Question Bank from my site, you should not buy it again. You can download it from the link available in your receipt email or your Gumroad account. If you face any issues, send me a message and I will resolve them.

Summary

The PMP exam is a combination of tough and easier questions. You may answer a few questions with just a quick glance, while you won’t be able to solve some regardless of your time and effort. I originally designed this Question Bank based on this pattern.

After this update, this Question Bank has only tougher questions, so scoring well here will give you more confidence in passing the real exam.

I recommend you buy this Question Bank, practice the questions, and increase the chances of your passing the PMP exam.  

Click here for more details

Update: As of Feb-2020, the current version of the PMP Question Bank is updated and aligned with the 6th edition of the PMBOK Guide.

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, this PMP Question Bank has helped over 10,000 PMP aspirants pass the PMP exam. 

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details

PMP Formula Guide

This is the most popular Formula Guide for the PMP Exam. If you face difficulty with attempting mathematical questions for the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details

Speak Your Mind

  • Fahad

    Unlike your many bloggers i am one who failed on xmass eve!

    I spent a lot of time on a providers questions (name withheld) . I cannot express my disappointment: all the exam questions were twice as hard and i failed. i blindly assumed a 80 % pass in providers would lead to a definite pass. 95% questions were case studies i swear! Also the exam is based on real life scenarios we hear of in the FT and on business media.
    I did not see any question on agile practices. I was not able to discriminate the items specific to 6th Ed.

    My question is where can i get the original PMP questions, or strongly similar i want realistic uptodate 2018 questions based on 6th Ed.
    I

    • Yes, this question bank has answers key, explanation of answers and relevant PMBOK reference whenever applicable.

  • I passed the PMP exam on 14th March 2018.

    Your PMP question bank was a great help in my preparation and I must say thanks to you.

    I will highly recommend this to others to go through this question bank.

    Thanks a lot

    Jawwad

  • Dear Fahad,

    I am currently preparing for my PMP exam mid February. When searching the web for information in addition to the PMBOK, I constantly find your site the most helpful and professional source of information. The quality of your articles and your committment towards your readers are truly standing out compared to any other site I have visited in the last few month. Thank you!

    Best regards
    Christian

  • Dear Mr. Fahad,

    How can I buy PMP Question Bank: Version 3.0 in Pakistan via debit card?

    I have passed my audit and now going to appear for the exam in 1st week of Jan 18.

    Can you please suggest simulator or practice material which is nearest to PMP real exam?

    Kindly suggest what should focus in last 10 days?

    • Hello Masood,

      Try using your debit, I hope it may work otherwise you may use the paypal. Except my question bank and mock test, I recommend PM Exam simulator by Mr. Cornelius Fichtner.

      As you have less time, I would suggest you stop lookin for any new resource and revise whatever you have studied.

      Good luck.

  • Hi,

    I passed the PMP exam yesterday.

    Your question bank was a great help in my preparation and I must convey a lot of thanks to you. The questions were tough and situational, quite like the real exam and the answers were detailed. Due to lack of time, I could attempt only the 1st practice exam but completing it within time and scoring 76.5% was a great morale booster for me. I also painstakingly analysed your each and every answer which strengthened my conceptual knowledge in quite a few areas.
    I will highly recommend this to others given that it is a great question bank at a very reasonable price.

    My only suggestion is if you can make a time-bound online version of these exams (may be at a bit higher price than the offline ones), that would be a great help to many.

    Thanks a lot
    Sourav Dutta

  • {"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}

    Recommended Resources

    Use these resources for your PMP certification exam preparation and pass the exam with minimal effort.

    __CONFIG_group_edit__{"jv80vv8f":{"name":"All Image(s)","singular":"-- Image %s"},"jv812jsg":{"name":"All Title(s)","singular":"-- Text %s"},"jv812qp8":{"name":"All Name(s)","singular":"-- Text %s"},"jv812zdt":{"name":"All Divider(s)","singular":"-- Divider %s"},"jv813402":{"name":"All Paragraph(s)","singular":"-- Text %s"},"jv813af5":{"name":"All Button(s)","singular":"-- Button %s"},"jv813f5t":{"name":"All Content Box(s)","singular":"-- Content Box %s"},"jv813k1c":{"name":"All Column(s)","singular":"-- Column %s"}}__CONFIG_group_edit__
    __CONFIG_local_colors__{"colors":{"c85e2":"Button ","f242c":"Border"},"gradients":{}}__CONFIG_local_colors__

    The PMP Training Program


    The PMI approved 35 contact hours training program that is 100% online, affordable, and help you prepare the PMP exam.

    __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
    Read More

    The PMP Exam Preparation Tool


    A PMP exam preparation course, that is 100% online and provide you everything you need to pass the PMP exam.

    __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
    Read More
    >