PMI RMP Question Bank 3.0

I launched this PMI-RMP Question Bank in 2014 and I have revised it many times as per the feedback received from successful exam takers. This is the second major update.

The first time, I updated over 50% of the questions. I inserted hyperlinks after each question and answer, so readers could flip easily back and forth.

For the second major update, I have increased the difficulty by over 40% of the questions.

I have deleted easier and one line questions to increase the challenge for PMP-RMP exam aspirants. I even rewrote and clarified the answer explanations.

This update has made this Question Bank even more invaluable. I assure you, this resource is invaluable for your PMI-RMP exam preparation.

Click here for more details

Please note, if you have bought the Question Bank from my site, you should not buy it again. Please check your inbox; the update has already been sent to you. You can also download it from your Gumroad account or contact me.

Summary

The PMI-RMP exam is getting tougher each year, and so is the PMI-RMP Question Bank. Over 170 sample questions will give you a glimpse of the real exam. Solving these questions will help you better prepare for the exam.

Best of luck with your PMP-RMP exam.

Click here for more details

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, this PMP Question Bank has helped over 10,000 PMP aspirants pass the PMP exam. 

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details

PMP Formula Guide

This is the most popular Formula Guide for the PMP Exam. If you face difficulty with attempting mathematical questions for the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details


Recommended Reading


Speak Your Mind

  • Hi Fahad,

    I bought your question bank in preparation for taking the PMI-RMP.
    It was a very good! After about intensive studying, I quizzed myself and got 72% on your questions; and then reviewed the ones that I got wrong. I must say, that your questions are harder than the real exam, so if reviewed properly, it will definitely better prepare the aspirants. Thanks for your good work.

    Arief

  • Hi Fahad, I am interested in bying this question bank, can you please quickly clarify the following?
    a) are these 170 questions totally distinct (different) from the 100 exam sample questions provided in another post?
    b) are these 170 questions updated according to PMBoK 6th edition?
    c) what is the format of the question bank? (word? excel? pdf? other?)

    Thanks,
    Aristotelis

    • Hello Aristotelis,

      a) Yes, these questions are different than 100 questions provided on the blog post.

      b) The PMI-RMP exam is still based on the fifth edition of the PMBOK Guide.

      c) It is available in pdf, epub and mobi formats.

  • Fahad Bhai, thanks for your articles on PMP, which were well written, easy to understand and clearly explained, i have become fan of you and your website pmstudycircle …. I have recently cleared my PMP with above Target and happy to acknowledge that out of many reference PMP materials i have used which includes your articles too, it contributed for clearing my doubts many grey areas on PMP , Thank you for your contribution …

    It is just that you have prepared questionnaire for RMP i have bought it to plan for my PMI RMP exam in future … it mentioned that it is based on PMBOK 5, are you planning to update your RMP questionnaire in near future and will I get any updated version for free or do i need to purchase? can you also share what materials should i refer/ read to clear PMI-RMP

  • Hi Mr. Fahad, I just want to know, in terms of the level of difficulty between your 400 PMP Question bank and PMP Mock Up Test (200 items)? Are the questions of PMP Mock up same as in PMP Question Bank?

  • Hi Fahad, I want to buy your PMP exam guide (400 questions) . Can i order this from Amazon.in does that have the latest version ? or should i buy it from pmstudy circle .

    Thanks
    Srikanth

    • If you buy from amazon, you will get only the mobi version. From this blog, you will get all three formats: pdf, epub, and mobi.

  • Dear Mr. Fahad,

    I am planing for the exam of PMI-RMP near future (Jan-2018).

    Please help me guide me to getting study material and extensive question bank.

    Your support will be highly appreciated.

  • I bought the 2.0 version and then got the 3.0 version as a free upgrade. This is a must have for any PMI-RMP success story. 100% recommended.

  • Hi,

    Today I bought the 3.0 version. Could you please tell me that how can I get the A2Z of the PMP certification free copy.

    Thanks

  • I bought the old version of question bank (V 2.2) on August 2017 & today I received the updated one for free, thank you for your ethics & good manner.

  • {"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}

    Recommended Resources

    Use these resources for your PMP certification exam preparation and pass the exam with minimal effort.

    __CONFIG_group_edit__{"jv80vv8f":{"name":"All Image(s)","singular":"-- Image %s"},"jv812jsg":{"name":"All Title(s)","singular":"-- Text %s"},"jv812qp8":{"name":"All Name(s)","singular":"-- Text %s"},"jv812zdt":{"name":"All Divider(s)","singular":"-- Divider %s"},"jv813402":{"name":"All Paragraph(s)","singular":"-- Text %s"},"jv813af5":{"name":"All Button(s)","singular":"-- Button %s"},"jv813f5t":{"name":"All Content Box(s)","singular":"-- Content Box %s"},"jv813k1c":{"name":"All Column(s)","singular":"-- Column %s"}}__CONFIG_group_edit__
    __CONFIG_local_colors__{"colors":{"c85e2":"Button ","f242c":"Border"},"gradients":{}}__CONFIG_local_colors__

    The PMP Training Program


    The PMI approved 35 contact hours training program that is 100% online, affordable, and help you prepare the PMP exam.

    __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
    Read More

    The PMP Exam Preparation Tool


    A PMP exam preparation course, that is 100% online and provide you everything you need to pass the PMP exam.

    __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
    Read More
    >