This PMP Formula Guide was published in 2013. It has been revised and updated continuously as per the feedback from professionals who have passed the PMP exam using it.

Although this guide has been revised many times, this is the second major update.

For the first, I added many questions and a chapter for miscellaneous formulas.

Even though practice questions were added to all lessons, procurement and risk management received a major upgrade.

In this update, I have added many questions to all chapters.

There are almost 50% more questions, this PMP Formula Guide has over 125 examples and sample questions.

The new questions are tougher.

Solving these questions will help you better prepare for the exam. If you follow this guide from beginning to end, I am sure that you can attempt any formula-based questions on the exam.

Read More…

If you have bought the Formula Guide from my site, don’t buy it again. It has already been sent to you. If you do not receive it, you can download it from your Gumroad account or contact me; I will send it to you again.

This Formula Guide is aligned with the PMBOK Guide 6th Edition and the latest PMP exam content guidelines.  

Summary

On the PMP exam, you will find many mathematical questions, and this Formula Guide will help you solve them. This Formula Guide is according to the latest exam trends and has been used by thousands of professionals to pass the PMP exam.

This update has made this guide better than ever before.

I recommend you buy this Formula Guide, use it to understand the math-based concepts, and increase the chances of your passing the PMP exam.

Read More…

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, this PMP Question Bank has helped over 10,000 PMP aspirants pass the PMP exam. 

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details

PMP Formula Guide

This is the most popular Formula Guide for the PMP Exam. If you face difficulty with attempting mathematical questions for the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details


Recommended Reading


Speak Your Mind

  • Guys,
    I have used this when I was pursuing my PMP, it was very much helpful.
    it is moral responsibility to give this feedback, so the publisher and aspirants get benefited.

  • The Guide – PMBOK needed to be used as the primary reference used on the PMP Exam. It has been observed by many trainers that correct answer for 75% of the questions asked in the exam is found in PMBOK Guide.

    It is best if you could go through it at least twice.

  • {"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}

    Recommended Resources

    Use these resources for your PMP certification exam preparation and pass the exam with minimal effort.

    __CONFIG_group_edit__{"jv80vv8f":{"name":"All Image(s)","singular":"-- Image %s"},"jv812jsg":{"name":"All Title(s)","singular":"-- Text %s"},"jv812qp8":{"name":"All Name(s)","singular":"-- Text %s"},"jv812zdt":{"name":"All Divider(s)","singular":"-- Divider %s"},"jv813402":{"name":"All Paragraph(s)","singular":"-- Text %s"},"jv813af5":{"name":"All Button(s)","singular":"-- Button %s"},"jv813f5t":{"name":"All Content Box(s)","singular":"-- Content Box %s"},"jv813k1c":{"name":"All Column(s)","singular":"-- Column %s"}}__CONFIG_group_edit__
    __CONFIG_local_colors__{"colors":{"c85e2":"Button ","f242c":"Border"},"gradients":{}}__CONFIG_local_colors__

    The PMP Training Program


    The PMI approved 35 contact hours training program that is 100% online, affordable, and help you prepare the PMP exam.

    __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
    Read More

    The PMP Exam Preparation Tool


    A PMP exam preparation course, that is 100% online and provide you everything you need to pass the PMP exam.

    __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
    Read More
    >