percentage of applicant selected pmp audit

If you are interested in the PMP certification and you are seriously considering applying for the PMP exam, you might be concerned about the PMP audit. It is a stressful event that can consume your thoughts. However, how worried should you be? How likely are you, by percentage, to be one of the aspirants selected for an audit?

In today’s blog post, I will try to clear up these worries.

First of all, you should know that your chance of being selected for an audit is 50%; either you will be or you won’t.

Now, the second question, about the percentage of applicants selected for an audit.

This is actually a mystery, and no one knows how many PMP certification applications are selected for an audit.

The PMI does not disclose the percentage of applicants they audit.

As per the PMI,

“All applications are subject to an audit, although only a percentage of applications are selected for audit. The selection of an application for audit is random.”

From the above statement, you can see that the PMI is specifically not saying how many people are audited; just that it is a percentage, a part of the whole.

Therefore, no one can predict the exact percentage of those selected for an audit; however, I believe that approximately 5-10% are selected.

These days (as of October 2019), I am receiving many emails from applicants who have been selected for an audit and need help. So, it appears to me that the PMI is now selecting more candidates. I believe the latest figure is around 20%.

As the process is random and anyone can be audited, it is best if you are ready for the worst-case scenario and prepare for an audit. You will know if you are selected for an immediately after submitting the PMP exam application form.

What Happens in the PMP Audit?

After applying, you will immediately know if you have been selected for an audit or not. If you are not, you can make the payment and then schedule the exam.

The PMI will send you an email with detailed instructions on how to proceed. You have to follow the instructions given in the email, to prepare all documents and send them to the PMI for verification.

Once the PMI receives the documents, they will review and within one week you will receive your audit results.

You will have 90 days to complete the audit process.

Your eligibility period will start the day you complete your audit, so don’t worry about running out of time to apply to the PMP exam. You will have a full year to pass the exam, whether you are selected for an audit or not.

Summary

Although nobody knows what percentage of applicants gets audited by the PMI, many experts have guessed it is around 5-10%. Moreover, as the process is entirely random, you can be selected for it. Therefore, before applying for the exam, make sure that you are ready for the audit.

Have you been selected for a PMI audit? If yes, how did you manage it? Let me know about your experiences in the comments section below.

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, this PMP Question Bank has helped over 10,000 PMP aspirants pass the PMP exam. 

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details

PMP Formula Guide

This is the most popular Formula Guide for the PMP Exam. If you face difficulty with attempting mathematical questions for the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details

Speak Your Mind

  • Sir, the process has changed. Now we don’t need to pay before audit. I passed the exam last week and my application was chosen for audit. The moment I submitted my application of pmhours/ experience I got an email from them that my application has been selected for audit.i did not pay anything before they cleared me for my audit and asked me to proceed with payment.

    Audit process is really cumbersome as you need to send this via post and PMI does not accept online documentation.

  • {"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}

    Recommended Resources

    Use these resources for your PMP certification exam preparation and pass the exam with minimal effort.

    __CONFIG_group_edit__{"jv80vv8f":{"name":"All Image(s)","singular":"-- Image %s"},"jv812jsg":{"name":"All Title(s)","singular":"-- Text %s"},"jv812qp8":{"name":"All Name(s)","singular":"-- Text %s"},"jv812zdt":{"name":"All Divider(s)","singular":"-- Divider %s"},"jv813402":{"name":"All Paragraph(s)","singular":"-- Text %s"},"jv813af5":{"name":"All Button(s)","singular":"-- Button %s"},"jv813f5t":{"name":"All Content Box(s)","singular":"-- Content Box %s"},"jv813k1c":{"name":"All Column(s)","singular":"-- Column %s"}}__CONFIG_group_edit__
    __CONFIG_local_colors__{"colors":{"c85e2":"Button ","f242c":"Border"},"gradients":{}}__CONFIG_local_colors__

    The PMP Training Program


    The PMI approved 35 contact hours training program that is 100% online, affordable, and help you prepare the PMP exam.

    __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
    Read More

    The PMP Exam Preparation Tool


    A PMP exam preparation course, that is 100% online and provide you everything you need to pass the PMP exam.

    __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
    Read More
    >