what does pmp certificate look like

The PMP certificate is one of the most valued certifications in project management. If you are preparing for the PMP exam, you must be wondering what the certificate looks like.

The PMP certificate is printed on hardened paper and has a professional design.

You will receive your PMP certificate by standard mail within four to eight weeks of successfully passing the PMP exam, depending on where you live and how long your mail service provider takes.

You will see the following information printed on your PMP certificate:

  • Your name
  • Your PMP number
  • PMP grant date
  • PMP expiry date
  • The signatures of the Chairman of the Board of Directors
  • The signature of the CEO & the president of the PMI

A sample of the PMP certificate is given below for your reference.

PMP-Project-Management-Professional-Certificate

Summary

The PMP certificate is a very precious document; keep it in a safe place where you will not lose it. This certificate shows the expiry date and that you are a PMP. You will have to pay the PMI 50 USD to reissue a new certificate if you lose it. It will take four to eight weeks to arrive.

Did you receive your certificate after passing the exam? Please share your experience in the comments section.

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, this PMP Question Bank has helped over 10,000 PMP aspirants pass the PMP exam. 

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details

PMP Formula Guide

This is the most popular Formula Guide for the PMP Exam. If you face difficulty with attempting mathematical questions for the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(59, 60, 61)"}},"gradients":[]}}]}__CONFIG_colors_palette__
More Details


Recommended Reading


Speak Your Mind

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}

Recommended Resources

Use these resources for your PMP certification exam preparation and pass the exam with minimal effort.

__CONFIG_group_edit__{"jv80vv8f":{"name":"All Image(s)","singular":"-- Image %s"},"jv812jsg":{"name":"All Title(s)","singular":"-- Text %s"},"jv812qp8":{"name":"All Name(s)","singular":"-- Text %s"},"jv812zdt":{"name":"All Divider(s)","singular":"-- Divider %s"},"jv813402":{"name":"All Paragraph(s)","singular":"-- Text %s"},"jv813af5":{"name":"All Button(s)","singular":"-- Button %s"},"jv813f5t":{"name":"All Content Box(s)","singular":"-- Content Box %s"},"jv813k1c":{"name":"All Column(s)","singular":"-- Column %s"}}__CONFIG_group_edit__
__CONFIG_local_colors__{"colors":{"c85e2":"Button ","f242c":"Border"},"gradients":{}}__CONFIG_local_colors__

The PMP Training Program


The PMI approved 35 contact hours training program that is 100% online, affordable, and help you prepare the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
Read More

The PMP Exam Preparation Tool


A PMP exam preparation course, that is 100% online and provide you everything you need to pass the PMP exam.

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"3e1f8":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"3e1f8":{"val":"rgb(255, 255, 255)","hsl":{"h":210,"s":0.01,"l":0.99}}},"gradients":[]},"original":{"colors":{"3e1f8":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}}},"gradients":[]}}]}__CONFIG_colors_palette__
Read More
>