Failed the PMP Examination: How to Recover & Pass the Next Time?

Fahad Usmani, PMP

Failing the PMP exam can be a significant setback. I’ve seen many candidates who failed the PMP examination and reached out to me, stressed and frustrated. But here’s the truth: many successful PMPs failed their first attempt.

Through correspondence with PMP aspirants, I’ve encountered numerous experiences. One candidate succeeded on their third attempt after two failures, while another navigated a near-expiration of their eligibility period. If you’ve faced this challenge, rest assured, you are not alone, and this is not the end of your journey.

In this blog post, I will explain why people fail the PMP exam, the current PMI exam retake policy, and how you can prepare strategically for your next attempt. By the end, you’ll have a clear recovery plan to help you pass the PMP exam confidently the next time.

Let’s get started.

Failed the PMP Exam: It is not the End!

Every year, thousands of professionals fail the PMP exam on their first try. The PMI (Project Management Institute) doesn’t publish official pass or fail rates, but community surveys and other industry experts estimate that 30–40% of candidates fail their first attempt.

The PMP exam is challenging by design. It tests your ability to apply project management principles—not just memorize them. If you’ve failed once, consider it a valuable learning step. Each attempt sharpens your understanding of the concepts and your exam strategy.

Remember, persistence pays off. One of my readers passed on her third attempt after two near misses. She used her failure report as a roadmap to success. You can do the same.

PMP Retake Policy: Attempts, Waiting Periods, and Fees

Understanding PMI’s latest retake policy is crucial before rescheduling your exam. The rules give you multiple opportunities to pass while ensuring you have time to prepare effectively.

key takeaway for passing the exam on second attempt

Key details:

  • Eligibility Window: You have one year from your eligibility approval date to pass the PMP exam.
  • Number of Attempts: You get three total attempts—the initial attempt and two retakes.
  • Waiting Period: You must wait at least 14 days between exam attempts. This allows time to assess weaknesses and refine your study plan.
  • Retake Fees: For PMI members: USD $275 per retake, and for non-members: USD $375 per retake

If you’re not a PMI member, consider joining. Membership costs $139 per year and provides discounts on retakes, access to PMI’s online community, and the PMBOK and Agile Practice Guide (your primary references).

If your one-year window expires before you pass, you must wait for one year and then reapply for a new eligibility period. PMI may grant short extensions in exceptional cases if all three attempts are unsuccessful.

For official details, visit the PMI Certification Handbook.

Key PMP Exam Statistics and Failure Trends

While PMI keeps exact statistics private, independent surveys show these averages:

  • First Attempt Pass Rate: 55–60%
  • Second Attempt Pass Rate: 70%
  • Third Attempt Pass Rate: 80%+

The exam’s difficulty comes from its focus on real-world application rather than rote memorization. Recent versions emphasize Agile and Hybrid approaches, which now account for nearly 50% of exam questions.

A study of recent PMP test-takers found that candidates who conducted a structured self-assessment after failing improved their scores by 20–30 points on the next attempt. This shows that reflecting and adjusting your preparation strategy makes a difference.

How to Recover and Pass the PMP Exam in Your Next Attempt

You can follow the following steps to pass the PMP exam on your next attempt:

Step 1: Conduct a Self-Assessment After Your Fail

Before you start studying again, take time to analyze your score report. PMI provides a domain-wise performance summary—People, Process, and Business Environment. Identify where you were marked Below Target or Needs Improvement.

Ask yourself:

  • Which question types felt hardest—situational, Agile, or math-based?
  • Did I struggle more with definitions or application questions?
  • Was time management a problem?

Write down your answers and mark your weakest areas.

Then compare your study methods to your results. Did you spend enough time practicing situational questions? Did you take mock exams under timed conditions? A clear-eyed review gives you a precise roadmap for your retake.

Step 2: Fix Common PMP Exam Preparation Mistakes

Most failed attempts result from how they study, not what they know. The following are four common mistakes and how to fix them.

I. Inadequate Preparation Depth

Many candidates rush from completing their 35-hour training course straight to scheduling the exam. That’s a mistake.

Fix:

Plan 8–12 weeks of dedicated study time. Spend 2–3 hours daily, focusing on both conceptual understanding and practice questions. Use at least three reliable sources, such as:

  • PMBOK® Guide – Sixth & Seventh Edition
  • Two PMP Exam Reference Books

Practice with over 1,000 questions from simulators. Consider tools like Cornelius Fichtner’s PM Exam Simulator, which mirrors real exam conditions.

II. Relying Too Much on Free Resources

Free PMP materials can help, but many are outdated or too easy.

Fix:

Use trusted, updated materials aligned with the 2026 exam content outline. Explore paid question banks and simulators. For curated options, check PMP Exam Prep Resources and Tools.

III. Misunderstanding the Exam Format

The PMP exam isn’t about how you manage projects in your company—it’s about how PMI expects a project manager to act.

Fix:

Train your mind to think in PMI’s terms. When answering situational questions, ask:

“What would PMI recommend in this case?”

Avoid personal or company-specific logic. Focus on PMI’s best practices.

IV. Underestimating Exam Pressure

The exam lasts 230 minutes. Many candidates fail because of fatigue or poor time management.

Fix:

  • Take full-length mock exams with real timing.
  • Include short breaks to build stamina.
  • Use relaxation techniques before the exam, such as deep breathing, short walks, or meditation.

This combination builds focus and reduces stress.

Step 3: Build a Smart PMP Exam Recovery Plan

A clear plan can turn failure into success. The following is a four-week retake timeline you can follow.

Week 1–2:

  • Review your weak domains (e.g., People or Business Environment).
  • Revisit misunderstood concepts in PMBOK and Agile Practice Guide.
  • Practice 60–80 questions daily, focusing on problem areas.

Week 3:

  • Take two full-length mock exams under timed conditions.
  • Analyze every wrong answer to understand why you missed it.
  • Aim for an average score of 75% or higher before booking your retake.

Week 4:

  • Focus on revision, formulas, and quick recall.
  • Rest well before your exam.
  • On test day, stay calm and approach each question methodically.

Use Proven Study Tools

The following are reliable resources to help you prepare effectively:

Frequently Asked Questions (FAQ)

Q1. How many times can I take the PMP exam?

You can attempt the PMP exam three times within a one-year eligibility window. If you fail all three, you must wait one year before reapplying.

Q2. How long do I have to wait before retaking?

PMI requires a 14-day waiting period between attempts, giving you time to review and improve.

Q3. Does failing the PMP exam affect my record?

No. PMI does not record failed attempts publicly. Only your passing result appears on your profile.

Q4. Do I need to complete 35 hours of training again for a retake?

Not unless your eligibility period expires. If it does, you’ll need to submit a new application and training record.

Q5. Are math questions still part of the exam?

Yes, but they make up a small portion (about 5–10 questions). Focus more on situational and Agile-based questions.

Q6. Can I retake the PMP exam online?

Yes. PMI allows candidates to take the exam either at a test center or online via Pearson VUE.

Summary

Failing the PMP exam is a temporary obstacle, not the end of your journey. With over 1.58 million certified professionals worldwide, persistence is a proven strategy for success. Take time to conduct a thorough self-assessment, identify where you fell short, and refine your preparation methods. Strengthen your weak areas, practice consistently, and approach your retake with confidence. 

Every failed attempt brings you one step closer to achieving your PMP certification and advancing your project management career with renewed determination.

Further Reading:

References:

Fahad Usmani, PMP

I am Mohammad Fahad Usmani, B.E. PMP, PMI-RMP. I have been blogging on project management topics since 2011. To date, thousands of professionals have passed the PMP exam using my resources.

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, it has helped over 10,000 PMP aspirants prepare for the exam. 

PMP Training Program

This is a PMI-approved 35 contact hours training program and it is based on the latest exam content outline applicable in 2026.

Similar Posts

  • What is the PMI Refund Policy for the PMP exam?

    So, you have applied for the PMP exam, you’ve set your test date, and then life snuck up on you and you can no longer attend. Naturally, you want your money back. You need to know the PMP exam fee refund policy.

    PMP Exam Fee Refund Policy
    The PMP exam fee refund policy is as follows:

    “To obtain a refund for the PMP credential, you must make a request to PMI at least 30 days before the exam eligibility expiration date. PMI will retain a processing fee of 100 USD if you have not yet scheduled or taken the examination. Also, you can receive a refund, less a US $100 processing fee, if you fail to meet audit requirements.”

  • PMP Application Process: Step-by-Step Guide

    The Project Management Professional (PMP) certification is awarded by PMI and it is renowned in its field. If you are interested in this certification, eligible to apply for it, and fulfill all the conditions, you should do so.

    The PMP exam application is easy but quite tedious and time consuming. It asks for a lot of information. So, if you are going to apply for the PMP exam and about to fill the application form, this blog post will help you understand the process.

    I hope after reading this blog post you will be able to fill out the form with ease.

    Firstly, make sure that you are eligible to apply. Please do not waste your time and effort if you know you are not qualified. Make sure that you fulfill the eligibility requirements before applying for the exam.

    If you are interested in the PMP certification but don’t qualify for it, you can make yourself eligible with a little effort.

  • Is the PMBOK Guide Enough for the PMP Exam? Find Out Here!

    I often receive emails from PMP aspirants asking advice regarding study resources for PMP exam.

    They ask me if the PMBOK Guide is enough for the PMP exam preparation.

    Please note, the PMBOK Guide is a must-read book for the PMP certification exam. You must read the PMBOK Guide several times before taking the PMP certification exam because it is the basis for this exam.

    However, you must also refer to some other PMP exam preparation books to pass the exam because the PMBOK Guide does not explain all the concepts well and does not address all the questions on the test.

    You also have to practice exam questions to prepare for the PMP exam.

  • PMI Continuing Certification Program: A Guide to Earning & Recording PDUs

    Keeping your PMI certification active is essential if you want to stay relevant in today’s fast-changing project environment. The PMI Continuing Certification Requirements (CCR) program ensures that certified professionals continue to grow their skills and knowledge over time.  By earning Professional Development Units (PDUs), you not only maintain your credential but also strengthen your ability…

  • PMP 35 Contact Hours Validity: Do PMP Contact Hours Ever Expire?

    I often receive emails from my blog visitors asking about the validity of their 35 contact hours, such as:

    “I earned my 35 contact hours a few years back, are they still valid?”

    or

    “I got my project management training based on the 5th edition of the PMBOK Guide. Now the PMP exam is based on the 6th edition, can I apply for the exam now based on my old contact hours, or are they expired?”

    Many visitors ask me that they have completed the training. Now they wonder when their contact hours will expire so they can plan their PMP exam accordingly.

    So, if you have the same doubts, do not worry.

  • 10 Benefits of PMP Certification: Worth it (Salary and Career Guide)

    The benefits of the PMP certification are immense. You will realize them once you become a PMP.

    I often receive emails from visitors who want to know if applying for the PMP exam is worth it. They want to know the advantages and if it is a good investment of time and money.

    They compare the PMP certification with others, such as PRINCE2. These aspirants are looking for instant gratification. They are usually looking to get an immediate salary raise or a promotion.

    So, to answer this type of questions, I am writing this blog post. I hope you will have a better understanding of the benefits of having the PMP certification.

140 Comments

  1. I am scheduled to take the PMP soon. One of my acquaintance who took the test recently had some technical issues. What are my options in such a situation? Will i be allowed to finish the test same day or will i have to reschedule?

  2. Hi Fahad, thanks for your article, it allowed me to find out about the extension possibility. The following sentence, however, is either misleading or incorrect:

    “Even if you don’t attempt the exam or you failed in the remaining two attempts, you cannot sit for the test for the next year.”

    This could suggest to people that not attempting the exam at all or attempting it only once during the eligibility period forces you to wait one full year before you can re-apply. And that’s not true, at least not if you fail only once during your eligibility. I am about to take my first exam and won’t have enough time to re-take it within the same eligibility period. The PMI customer care confirmed that if I fail this first attempt, I can re-apply for a new eligibility at any time.

    Please correct the above sentence as it may cause people to panic ;)

    1. Hello Mike, this is something new to me.

      Thanks for letting me know about the issue. I have updated the blog post.

      1. Hi Fahad,

        just to clarify and leave all doubts out – there is a penalty period of that 1 year in the case that for instance you schedule the exam, but don’t show up. Also there is the penalty year for failing 3 times within one eligibility period. There is no penalty year to re-apply if you don’t fail all your 3 attempts or don’t attempt the exam within one year at all.

        But all in all many, many thanks for the very informative content here!

        Best,
        Mike

  3. I also want to ask, how long does it take for PMI customer care to reply.If they extend, will they send an email to you or you will just check ur PMI page.Thanks

  4. Pls Sir, I have already paid to take my exams but couldn’t schedule because there was no space in the prometric center for me to sit for exams. My eligibility will expire tomorrow and I have send an email to PMI customer care to extend the eligibility date for me.I haven’t seen any response and am worried.Pls is there any other thing u can suggest for me? I need urgent reply.Thanks

  5. Fahad,
    I took my first attempt on May 17th and failed. I got needs improvement in 4 areas and below average in one. I was devastated because my test was very easy. To get scores that awful is unbelievable and is causing me to believe that the test is clearly rigged. I do plan to retest but it’s like I have to start all over. I guess I didn’t understand anything.

  6. Hello Fahad. Many thanks for your availability to support. I will take the PMP 1st exam on 9May. My eligibility ends on 23May.
    In case I need to use a 2nd attempt can you share if it is usually accepted the request for the extension period of eligibility for more 3 months?
    Also, is there any particular information we need to send to PMI to request for the extension period or just an email requesting it is consider to be enough?
    Many thanks for sharing your experience. Regards

    1. It depends on case to case basic. Generally they are lenient and an email with a proper explanation will be enough to get a three months extension.

  7. Hi,

    I failed on my first attempt today. When I join the official pmi website, I don’t find the retake exam(apply) link. Page is still showing my first exam information. How much time does it take?

    thank you

    1. Hello Chris, I am sorry to know that you have failed the test. Please wait for at least one week.

  8. Hello,

    I was failed my first attempt in November 2018. My eligibility date was expired on 14.1.2019. So, I was requested extension three months from PMI care center. I got it but if I can’t try PMP second attempt in extension three months when I can start second attempt and I need to apply application form and pay fully member fee again? Please give me information detail.

    1. If you don’t pass the PMP exam and your eligibility expires, you will have to wait for one year to apply again. Yes, you will have to pay full exam fee.

    2. Hi. Many thanks for sharing your experience.

      Can you please confirm if the PMP eligible period was increase by 3 months?
      Can you please share what kind of details you forward to PMI so that they accept the eligibility extension?

      I’m in a situation that eligibility will end soon and I need more time for exam preparation

      Many thanks for sharing
      Kind regards
      Isabel

  9. My one year eligibility will end December 19 2018. I already attempted the exam once and failed. When I reapply, do I have to do everything all over, or do they pull up the old application and i resubmit it?

    1. You have to reapply before 19 July.

      Or you can ask for three months extension from the PMI so you can prepare better.

  10. Hello,

    I gave exam for the first time on Mar 21, 2018.
    My PMI Renewal date is Dec 31, 2018.

    I also paid my exam fees of 275USD for the second time. However, I haven’t received yet any confirmation for my payment.

    Also, should I wait for the confirmation? When can I schedule the exam?

    Thanks.

  11. What happens if I fail my second attempt and my eligibility expires without taking my third chance, would I be able to do my PMP application again right after or I would have to wait one full year to apply again?.

    1. Hello Mar, I would suggest you contact PMI customer care. They might be able to increase you eligibility expiry so you can use your third attempt.

  12. Hello

    Im in desperate need of your help.

    My expiry date to write the exam is 5 September 2018. I desperately need to extend this timeline.

    History:

    i wrote the test and failed 2011/2012 (i think). I built the courage to retake the course in 2017 which I did. I have undergone an operation November 2017 and underwent IVF treatment 2018 so was unable to prepare for the test. It was the fear of retaking the test and the stress of the IVF treatment that I kept postponing. I do honestly want to pass this exam, please advise if I can extend the expiry day to December 2018?

    rgds
    Kris

    1. You can write to PMI customer care and ask for extension. Usually they extend the expiry date by three months.

  13. I didn’t appear for the exam and my eligibility period was expired on 17th July 2016. Now am preparing for the exam and am planning to appearing for the exam on August 2017. Is there will be any ban for me for the same?

  14. I failed once in PMP and my one year eligibility is valid till 24th September 2017, I want to take my 2nd attempt on 3rd May. Is there a possibility that my profile goes for audit now in 2nd attempt? which may delay my exam date.

    1. You may or may not be selected for an audit. Please note that, you may also be selected for an audit after passing the PMP exam.

  15. Hello All ,

    Today i failed in my pmp exam , i am so much depressed as i studied continiously since 4 months and i preapared alot almost study around more than 500 hours in these 4 months .I read the PMBOX couple of time plus rita also and solved more than 2000 questions , but i dont know why i failed .

    I got below proficient in 3 knowledge areas and and 2 moderate .

    Can some one here guide me any tips how can i pass my pmp again ?

  16. Dear fahad,
    How are you? How are you doing?

    I need your help on two scenarios:

    First scenario:
    Application has filled and provided eligibility of one year given by PMI to take exam, if i do not take exam i will forefeit my fee. is this right. i can reaaply with full fee and can take exam right without waiting for one year, please advise.

    applied for exam, since i could not manage my my preparation, can i can cancel my exam how much refund PMI provide and important thing is eligibility period of one year is going to expire in few days. Is it advisable to take exam at this point of time, since self on corner situation where things cannot be pulled out.if i take the exam and failed, shall i wait for one year for taking the re-exam. please advise.

    regards
    Reddy

  17. I took the PMP 3 times.

    First time was on Oct 22 2016, I got 1 Moderately Proficient (Planning) and the other 4 were all Below Proficient. I failed.

    Second time was on Oct 29 2016, I got 2 Moderately Proficient (Monitoring/Controlling and Closing). The other 3 were all Below Proficient. I failed.

    Third time was on Nov 27 2016, I got 3 Moderately Proficient (Initiating, Monitoring/Controlling and Closing). The other 2 were all Below Proficient. I passed.

    From what I heard and what I seen as an experienced PMP test taker (took it 3 friggin times), I can tell you that they made the PMP exam a lot harder but made the passing rate easier to achieve. I knew all the terms and processes but almost all questions were situational.

  18. Dear sir ,
    I failed in my first attempted in the exam , the eligibility was near to end, I sent to PMI to get an extension.
    they kinldly sent an extesion for 3 months .
    but when I search for courses to enforce my knowledge & to study hard to pass the exam, I found the course duration is 4 months.

    So, I decide to join one of them to study well, but my eligibility will end before this course ends.

    My question : is there any punishment if I don’t take the exam during the eligibility period which ends in 13-2-2017
    . And can I reapply for PMP certification again to have three chances & study well to pass the exam.
    thank you
    My respects

  19. I have appeared in pmp exam and failed. My application was not audited first time. Now, I am again thinking of reappearing. Will my application will be audited second time when I will pay the fees as I am out of country and it will be difficult for me to arrange my documents if my application got audited?

  20. Hi,

    Yesterday I have fail in my first PMP attempted. I had read PMBOK and Head first book and also attempted many online mock test e.g. headfirst and score 88 %.

    I have got below proficient in planning, execution, and monitoring.

    a. Please suggest me how can I improve for next time.
    b. Is it possible for paper test instead of online test in north india.

    Thanks.

  21. I just took my pmp exam but couldn’t make it.I got 3MP in closing,executing & initiation process group while BP in planning & executing.I read PMBOK many times & take exam simulator from PM study & Cornelius scoring above 80% .Plz wht should I do?

    1. Hello James, I’m sorry to know that you failed the PMP exam.

      First of all I would suggest you to take rest for couple of days, then start planning to pass for the next time.

      I suggest you download my free eBook “how to pass the PMP exam on second attempt” and read it.

      https://pmstudycircle.com/pass-pmp-exam-on-second-attempt/

      After you finish reading, you can contact me again if any further help needed.

      Good luck.

  22. Hi Mr. Fahad,

    I am in the process of preparing PMP exams since from Jan-2016.I started with Head First after that Edward and finally Rita, however i didn’t referred PMBOK Fifth edition. Should i need to prepare PMBOK? or i can revise the above three book once again before preparing exam.

    Also i need some clarity in expiry date for PMP exam fee, for instance if i am paying my exam fee in the month of Sep-2016, is it Valid till Sep-2017 with 3 attempt minimum or it’s Valid till Dec-2016 and i need to Pay once again in the year of 2017.Kindly clarify this based on which i need to plan my exam date and pay for my exam.

    I have been using Mobile app for answering PMP questions, should i need to follow other way. Kindly suggest better one to crack the exam.

    Thanks in Advance!

    Regards,
    Kannan Hariharan

    1. You must read the PMBOK Guide to pass the exam, there is no alternative to this book.

      Also, your eligibility period starts from the day you received the email from PMI confirmation acceptance of your application.

      Regarding practicing questions, you can use any suitable medium.

  23. Hello Fahad,
    I’ve failed my examination twice now and am planning to sit for the 3rd attempt, however, should i wait for my eligibility to expires so that I do not have to wait for another year to sit for it in case my 3rd attempt also fails?
    There are some site stated, best to wait for the expiry of the eligibility period and to reapply for 3 tries without to have wait for a year.
    Appreciate your feedback

    1. As per my understanding, if you are not able to pass the exam within one year, you will have to wait for one year to apply for the exam again.

  24. Dear sir,
    Today was my first trial for PMP exam and I failed .(low moderate in planning and closing). Although i studied very well (Pmbok ,Rita,fast track..) More than three times and my score was 95%!! Sometimes more.anyway I replied very good in the exam but the results was unexpected to me. So would you help me in replying the following:
    1- what is the max. No. Of process could be low proficient to pass? As I saw between your comments that one candidate failed and has only one low proficient !!
    2- there is any possibility to claim my results? Or get it detailed score?
    3- how long you think it is enough to get prepared for second trial.
    Thanks and best regards

    1. Hello Ayman,

      If you are getting consistently more than 95% in mock tests and failed the test, I believe something is wrong.

      First of all I suggest you contact PMI customer care and let us know their response.

      If you were not well prepared in first trial, one to two months times is enough for second trial.

  25. Hi Fahad,

    I just took the pmp exam yesterday for the second time and failed again :-/ I am quite discouraged as I felt like I did really well on this exam and felt I would/should have passed it, but I got BP in all process group areas. I thought for sure I would have at least gotten two or three MP. Is there a threshold that PMI sets for each process group in order to get a passing score?

    Also, studying for my second attempt I took 50 question practice quizzes (timed) every day for the past 3 months I felt ready for this but still failed, I don’t test very well though. Do you recommend me possibly getting a Tudor? If so, do you know of any that are affordable and useful? So far I’ve found pm-prepcast.com/coaching, ever heard of it?

    1. How did you prepare for the first and the second time and what material you used? Please let me know these things then I will reply you.

      And don’t go for any other training, as per me, it will be waste of money.

      1. The first time I took a boot camp course with a company called intense school/infosec institute. The class covered PMBOK material and what to study for. Unfortunately I didn’t get a chance to take the exam right after the class ended when it was still fresh in my mind, because there was no available seating at the closest test center for me. I took practice quizzes, read the PMBOK and went off exam tactics that was offered from the course, had a dump sheet etc…

        The second time I paid for an exam simulator at pm-exam-simulator.com. It offers 9 practice exams and over 1500 questions, as well as timed quizzes and practice quizzes. I mainly focused on this exam simulator as I felt it offered a lot of situational questions which is what I struggle with. I took these quizzes and prep exams from January up until I took the real exam this past Friday.

        My concern is I don’t know what else to do and how else to prepare and for how long in order to pass. This will be my 3rd attempt coming up and I don’t want to have to wait another year and go through the application process again.

        1. Erich,

          Was the PMP exam any where near/closer to the mock exam you bought (pm-exam-simulator.com). If yes, please check for gaps. If no, do you think PMP exam was near any other mocks you under took. Please reply with the comparison of Mocks Vs real PMP exam.

          Also, what other mock exams did you try other than (pm-exam-simulator.com).

          1. Hi Kri,

            I would say that the mock exams and quizzes that I bought from pm-exam-simulator.com were actually pretty close in comparison. The situational questions were pretty similar, only thing was the wrong answers in the mock quizzes were more obviously incorrect than that of the pmp. I felt the real exam made all the answer choices seem correct and didn’t really have an obvious incorrect answer, which made it that more difficult for me. That would be the main difference I would say.

            I didn’t take any other mock exams only the pm simulator and also the questions I got from doing my boot camp class

        2. Did you refer any PMP exam reference books?

          If not I suggest you buy Head First PMP and Kim Heldmen (or Rita). Read Head First from cover to cover and then go for Kim heldmen.

          Also refer the PMBOK Guide as many times as you can.

          I also recommend you extend your simulator access for further three months.

          I hope this will be enough for you to pass the exam.

          Also, don’t take stress it will only demoralize you. Prepare a study plan and follow it accordingly.

          1. Thanks Fahad for the advice and guidance. I will get the head first book and put together a plan, much appreciated!

            1. Also which edition of Head First PMP should I get? I found two books one is Head First PMP and the other is 3rd edition, unless they are both the same?

  26. Hi Fahad,

    I scheduled my exam for 1st attempt but was not able to appear for test due to health problem, by the mean time my eligibility was about to expire, then I cancel my appointment and request for extension, PMI approved 3 months extension. In next three months I failed in my 1st attempt and does not scheduled 2nd attempt, now my eligibility got expired.

    Please advise now I need to wait for one year or I can apply for exam any time with full exam fee or re-exam fee.

    1. As per my understanding, you will have to wait for one year to apply again for the PMP exam. Please contact PMI customer for further clarification.

  27. I failed today and am heart broken
    I was scoring 70+% in all the practice tests and even while giving the test was hopeful that I will pass. Would it be a good idea to appear within the next 1 month? I have read Rita 3 times and PMBOK 1 time. What are your suggestions for me

    1. This is the first time I am hearing that PMI has extended the deadline for someone.

      Thanks Ahab for updating with this information.

  28. I have failed my PMP exam in the first attempt and also my eligibility period of 1 year is over now. From PMP hand book it is not clear whether I can reapply now or wait for one year .
    What about contact hours ? Can i use previous one ?

    Thanks in advance

    1. As per my understanding, you will have to wait for one year to apply for the PMP exam again.

      Dont worry about your contact hours, you will be valid for ever.

  29. Hi Fahad,

    I find your post very easy to understand. Now that the course is changing would you be updating the question bank.

    And i would like to give the exam by the end of this month and would need your advice on understanding how to logically recall the ITTOs.

    Thanks!

  30. I know 61% is not a pass mark to get certified, what if we get 3 BP and 1 MP and 1 P. would it be consider pass or fail, is there any link related to this conversation?

    1. I did not see anyone with 3 BP and pass the exam. You can pass the exam with 2 BP if you score well in others process group.

  31. Hello Everyone,

    Today I just passed PMP exam and wanted to share with you my experience.

    First thing you should do is to avoid losing too much time on internet, forums even this kind of websites. Definitely, you may need some information and as soon as you get it, turn it off.
    Second, do not demotivate yourself in the exam. My first 30 questions was horrible, there were all scenario questions and I was just selecting random answers and watching remaining time which made me nervous. At this point, I though I will fail today and also started to think how to re-schedule my new exam :) Suddenly, some definite answer questions started to show up like Earned Value, Floats etc. and started to feel me more comfortable. When I reached 80th question, I take a break 3-4 minutes and then go back to exam. After 100th question, I realized that I am getting more familiar about PMI’s point of view and its exam structure more and more. When I reached 150th question, I started to feel that I will pass it TODAY. By the time I finish 200 questions, I had 40 minutes more and jump back to horrible first part of the exam and revised them. I changed my most of the answers up to 50th question.

    As a result, I passed
    Levels of proficiency:
    Initiating the Project: Moderately Proficient
    Planning the Project: Proficient
    Executing the Project: Moderately Proficient
    Monitoring and Controlling the Project: Moderately Proficient
    Closing the Project: Moderately Proficient

    How did I study?
    7 consecutive (non-stop) days to study Head First PMP.
    I DID all exercies in Head First PMP, puzzles, and final PMP mock exam.
    Before 1 day to exam, I re-studied Integration process and Initiating and Closing phases in Head First PMP.
    I NEVER read PMBOK,
    I NEVER read Rita’s or other books,
    I NEVER did a full 200 question mock exam to prepare PMP test because it is boring.
    I DO NOT have PM experience in my daily jobs.

    Please ask If you need more clarification.

    1. Congratulations for passing the exam, however I will suggest you refer the PMBOK Guide at least two times to understand it.

  32. Hi Fahad,

    I have just failed on my first Trial PMP exam yesterday , i really shocked as i was preparing very well for this exam i have studied Rita Book 2 times , PMBok Guide , Answer 1200 Question from Rita Fast Track, download oliverlehmann Exams ,PM Exam simulator overall i have approximately answer around 3500 Questions . I have start studying middle of June and enter the Exam on 9th August. In addition to in the last 8 days before the Exam , Every day i was answering full 200 Question and my daily score was 80%,75% 74%,76% .

    My question now that i need to enter again but i don’t know what to do more than I did. I think i do my best .

    Advice please .

    1. I am sorry to know that you have failed the exam.

      You have right material with you. However I suggest you buy head first PMP and read it thoroughly. Then go through Rita and the PMBOK Guide. After you complete it, you can start practicing questions.

      Hope you will pass next time.

      Fahad

  33. Hi Fahad,
    I took the test late last month I did not pass although I thought I am well prepared for the test, I was running out of time during the test when the four hours ended I had 67 questions did not solve! I felt bad because I was not able to know what process is my weakness, I only got professiont in initiating proces and the rest all below professiont. My question is what is your advice in terms of managing the time during the test? I noticed that no one has the same problem as I did please your advice

    1. I am sorry to know that you have failed the test. After reading you comment I can say that you were simply not prepared for the exam. So, you need to start from scratch to pass the test.

      Please let me know that how did you prepare for the exam in detail then only I will be able to advice you accordingly.

  34. 2 days ago I took the first trial exam in Prometric testing center, but unfortunately I didn’t pass.

    Really I’m surprised when I saw that on the screen after finishing the exam because during the 4 hours exam I was selecting the best choice as recommended by PMI and for each question I was precisely check it before selecting the choice, during my preparation I solved more than 20 exams from different sources (Rita,Exam Central,PM study,Head First) and my score between 72 TO 84 % that’s why I scheduled the exam !

    Really I don’t understand how come I didn’t pass ! I spent more than 6 months in studying(Rita,PMBOOK,HeadFirst) and did a lot of efforts, Actually I’m disappointed from this result!

    I feel that exam score is evaluated based on something hidden and it depends on luck not on studying.

    I don’t know if i’ll have courage to take the exam again or not because I don’t have the trust.

    1. If the questions are easy, the score is higher and if the questions are tough, the passing score is lower. All questions do not carry the equal weight.

      I am sorry to know that you did not pass the exam in your first attempt. I hope you will pass the exam in your next attempt.

      Good luck for your next attempt and let me know if you require any help from me.

  35. I had given PMP exam 2 weeks back but failed. I had taken computer based test.
    Monitering and Control, Executing and Closing are Below Proficient. I had studied Rita once and PMBOK once. I had done 2 moc tests headfirst and PMstudy and scored 70% in both. I had practised tests from PMI site too and on average scored 65% in all tests.

    First 25 ques were lengthy. I was very confused nd got struct in first 25 ques and spent first 1 hour only to complete 26 ques. At the end of 1 hour had completed only 26 ques. I was tensed then and just then there was another person who started his exam and started making lound typing noise of keyboard which was distrating me a lot. At end of 2hrs I had completed only 78 ques. I got panicked and then could not concentrate on the remaining 2 hrs and remining questions 122 ques. Felt that last 50 ques were simple. But as I had less time in hand could not read the whole ques and undestand and pick answer.

    I fould that I had difficulty on answering situational ques of what next. I was not able to pick proper option. Secondly was with mathematical questions. Can you let me know where I will get practice questions for situational and mathematical.

    Now I am planning to take paperbased exam on 25th July. Could you please advice how I can study and pass in second attempt.

    1. Your scores were not good in mock tests. You must score above 80 to 85%, then you should go for the exam.

      Let me know how did you study, and what resources have you used during your preparation.

      1. I had read PMBOK and Rita once and did all 29 practice tests from PMI sites PMP Exam Prep: Questions, Answers, & Explanations by Christopher Scordo . Had done 2 free mock tests of headfirst and PM study. Want to pass in my second attempt at any cost. Please help

        1. This was not enough. You should read PMBOK Guide at least twice or thrice. I suggest you buy head first PMP and read it from cover to cover. Then refer the PMBOK Guide again, and Rita Mulcahy.

          Buy any good simulator to practice some questions.

  36. Hi Fahad,

    I have failed my PMP exam in First attempt , really was confident before exam as i had study Rita mulchahy 2 times , head first 2 time and PMBOK 1 time . And was able to score on Mock test close to 80 % to 87% and also was able to score on Oliver 175 questions at 71 % .
    The exam questions were really confusing the starting few 10 to 20 questions really got my confidence low and it had also taken lot of time . And it was really hard to recover back !!!
    I feel i know the concept really well but the questions had demoralize me so much that i don’t know what to do.
    I want to re plan and take the exam really quickly and also want know which website mock test i need to practice to have quality questions like the real time exam …
    Please suggest
    Thanks
    zaheer abbas

  37. Hi Fahad,

    I really enjoyed reading the postings on here, and found them encouraging, as I failed my 1st attempt at the PMP exam a couple of weeks ago, and I am now preparing for my retake. I was moderately proficient in the initiating and monitoring & controlling process groups, and below proficiency in the other 3. I have a really strong grasp on all formulas, and the pretty much all of the inputs and outputs, I’m now trying to get a complete grasps on the tools and techniques. I feel that the hardest part of the exam for me, were the situational questions, and I really struggled to understand how to use my understanding of all the project management framework, processes, process groups, knowledge areas, and ITTO’s to answer these questions. My instructor from my boot camp, explained to me that I needed to use the ITTO’s to answer situational questions, however I the way the situational questions were set up, didn’t really give me the opportunity to apply them. Can you explain how you can actually use the ITTO’s or what you feel would best help guide me in answering situational questions? Most of them don’t explain what process you are in, or what you would do next. For example, if I get a question that states you are defining scope, what would you do next, I know I am going to create the WBS, but the situational questions seem like you really can’t use the process flows, or ITTO’s to answer them, they are very tricky and confusing. If I can understand how to use my knowledge of PM framework, to answer these type of questions, I know 100% I will pass my retake.

    Thank you!

    1. Hello William,

      I am sorry to know that you have failed the exam. However, I hope that you will pass the exam in your next attempt.

      Regarding the ITTO based question, there is no short cut. You must study the PMBOK Guide as many times as you can and try to visualize the process flow. You can also take help from rita process flow chart.

      For situation based questions, aspirants fail because they think the way they are doing the job in real world. Note that, you are attempting the PMP exam and you have to think the way as PMI. Imagine that you are working in a project which follows the PM principles as given in the PMBOK Guide. This will help you answers to situation based questions.

  38. Hi…thanks for your lovely article. Today I failed in my PMP exam for the first time. It’s a wrteched feeling. I tried very hard and in most of the simulation tests I scored 70 per cent. PMP exam is tricky as some questions are easy while others we. Some formula based questions were really tough and hard to understand. Feels sad not to make it on the first attempt. Read PMBoK many a times with head first.

    1. Don’t worry, hopefully you will pass the exam next time.

      Take some rest, and start your preparation again with fresh mind.

  39. Dear

    I am trying to pay the fees fro the second PM,P exam, actually I couldn’t be able!!, could you please advise the step- step to complete my payment& to get the new Eligibility no. to re-schedule the exam.

    Thanks for your advise.

    1. You have to enter the PMI site and click my certification. From there you will be able to make the payment. If you are still not able to do that, contact PMI customer care. I can guide you step by step because I don’t have this option with me.

  40. Hi Fahad,

    Good work from you, really appreciate it.
    My question is, I’ve failed in my first attempt on oct *8th 2014, as my eligibility was ending on 07th April 2015, I’ve scheduled my exam on the same day, though I must admit that I couldn’t prepare for it as I had thought because of my work commitments.

    In case, if I fail in the second attempt, do I’ve to resubmit the application again and do I have to wait for a year before applying, because I was going through your earlier comments and somewhere you mentioned about waiting for an year.

    Please advice and clarify.

    Thanks
    Haleem

    1. I think you can resubmit your application once your application expires because you did not utilize all three chances.

      Anyway, I suggest you contact PMI customer care, and update us as well.

  41. Dear Mr. Fahad Usmani,
    Hai , I would like to share my experience to yourself and need your guidance to move forward and I had failed in 3 attempts, in 2 and 3 attempts I had scored BP in execution and Monitoring and control and others are moderately proficient.
    I would like to know whether can I reappear for the exam immediately or do I need wait for some more time including ,
    Would like to receive your valuable advice for above informed and wanted to get the PMP certification at the earliest,

    Regards,
    Rajeshkumar

    1. Hello Suresh,

      I am sorry to hear it, however, I hope that you will pass the exam in your next attempt.

      Since you have failed in all your three attempts, and as per my understanding, now you will have to wait for one year before you apply for the exam again.

  42. I am planning on taking my PMP Exam in one month from now. If I ever failed in first attempt and passed the 2nd one, is it reflected/shown in my certificate? in online directory or anywhere else?? Anyway for anyone other than me and PMI to know I failed once??

    Too, I am thinking of using language AID hence English isn’t my mother tongue, the same, any way for anyone to know I used lanuage AID?? reflected/shown in certificate or online?? anyone other than me and PMI knows it??

    1. If you failed in the PMP exam, no one will ever know about it, except you and the PMI. It will also not be mentioned in the certificate. So no worries.

      Regarding the language aid, I believe this will also not be shown in the certificate.

  43. Dear

    I had appeared on 27th Jan but failed. BP in Planning & EXecuting. Infact i had done pretty well in the exam.
    Done Oliver 175 Q-61%, Simpli Learn -60%, Scordo Sets Avg- 65-70 %, PMFast Track-61%,Pmstudy-73%.

    Will Plan to appear in next 12-15 days. with Just Rita + PMBOK only reading.
    Is it ok for my Study plan for 2nd attempt. My Plan is for 9th or 16th Feb 2015.

    Pl Suggest your opinion. I have understand the processes & flow of each PG & KA.

    Regard’s
    MD Javeed

    1. I see that in your all tests you score less than 73%. This is not a good score, and you should score more than 80 to 85%.

      Since the time is less, I suggest you focus on what you have studied, revise it again, and don’t search for any new resource.

      Put more emphasis on the PMBOK Guide.

  44. Hi Farhad,
    1) I am an MBA and MGM with significant project experience in Oil and Gas Industry.
    2) I was focused for six weeks to prepare for my PMP exam.
    3) I went through Rita’s prep book twice , PMBOK 5th edition to follow ITTOS, e learning program from Knowledge book and refered various websites for reference study. I solved knowledge woods mock test papers ( three of them ) and I found poorly structured and discouraging which was very different from actually PMP EXAM.
    4) Truely your website was very useful.
    5) After all my attempts to get through the PMP exam in first attempt I was unsuccessful.
    I am motivated to get through PMP in second attempt. So I seek your advice to follow a path that would guarantee my success.
    6) as I know the subject well and got the ITTOS into my head. I guess I need to practice 4 four exam and try to get a score of 80 plus.
    7) I was wondering if you can help me to find about 20 sets of 200 questions that would enable me to practice 20 times like real PMP exam.
    7) I found Knowledgewood question were frame in context with Indian market conditions and too wordy and repetitive.
    8) As PMI is global based acre edited program and some basic construction culture and philosophies differed across culture, I was wondering if the PMP QUESTION structure and the pattern differs as well. In that case I would request to kindly help me the practice test questions based in Mort America as I am based in Canada.
    9) your kind concern and suggestion would be much appreciated.
    10) In addition I look forward for your valuable inputs and suggestion in this blog as well as in my email rajaditya@ hotmail.com
    Thanks much and Have a good day.

    1. Hello Raj,

      It seems you prepare quite well; however you loss it. Any I have a few suggestions for you.

      1) Buy Head First PMP Book and study it.

      2) Buy PM Exam Simulator from Cornelius Fichtner and practice questions.

      3) Read the PMBOK Guide as many times as you can.

      This will be enough for you to pass the exam.

      1. Thank you Farhad for your valuable advise and suggestions which is much appreciated .
        I was wondering if you know the statistics as to How many candidates write PMP every month/year and what percentage encounters success or failure in first , second and third attempt.

        Is there any way I can have access to at least 500 mathematical questions focusing on EVM, CPM, EMV, NPV, IRR, communication channels for best practice.
        Thank you once again for your time and consideration.
        Very Best
        Raj

  45. Hi Fahad,

    I have failed in my PMP exam the first time couple of years back. I am planning to take the test again, should I take up the 35 hour course again which I have taken last time? Please let me know the process.

    Thanks so much.

  46. I took a PM Study boot camp (did not have a good instructor). I also studied with 2 co-workers for several weeks where we each outlined a PMBOK chapter and “taught” it to the other 2. I have done MANY practice questions and exams through PM Study, HeadFirst and other sources. I felt completely prepared, but I have now failed my first AND second attempts. My co-workers all passed so I feel completely discouraged and stupid. I have been trying to verify with PMI if the 12 month period for re-examination is a calendar year or a rolling 12 months, but have not been able to find a definitive answer and Customer Care is not getting back with me. Do you know? As the end of 2014 is approaching that answer will factor into when I try again.

    I have never failed at anything academic in my life and at a loss as to how to proceed. I would appreciate any advice you could offer.

    Thank you,
    Lynn

    1. Review your result and see where you performed poor. I also suggest you buy kim heldman or rita’s book. Head first is good book but you must study any other book to understand the concepts better.

      Don’t try too much questions.

      Read the PMBOK Guide as much as you can and try to visualize the process flow.

      Hope it helps.

      Hopefully you will pass the exam in your next attempt.

      Good luck.

  47. Hi

    Today i failed in first attempt of pmp exam….I had studied pmbok twice, Rita once …memorized all itto of 47 process, practiced Rita software so many times and was scoring 85% …even real exam test I found quit easier. N clicked for answers appropriately based upon itto based question…for mathematical question very easy to get answer …found situational question matching Rita fast track situal question n answered accordingly …even during exam I was damn sure will pass the test…but once finished I failed,even in all domain areas….

    I don’t feel regret nor have any doubt on PMI test …just can’t find the reason how I failed…am not sure but feel perhaps you can clarify
    1) most of the question I marked
    2) i runned at last out of time n can’t click on end
    3) review all marked question by clicking previous button

    Can the above be reason that when ….hope you may enlighten

    1. Hello Sohail,

      I am sorry to hear about this but I assure you that none of the reasons you mentioned above may cause your failure.

      Please note that in the exam each question carries a different weight, so if you answer a easy question, you get less mark and if you correctly answer a hard question, you get more marks.

      I hope you will have your report card. Review the result and work on areas where you score less.

      Let me know you require any further help.

    2. This is the same what I would say – I studied so hard, I read so much, for 3 months I used to study between 8 and 16 hours per day. When I saw the real exam questions I was absolutely happy – I was 10000% sure I will pass. I had no problem even with one question. What was my surprise when I got a “FAIL” result! I didn’t believe! I was ready to swear on every my single answer, that it is correct. I follow strictly Rita’s methodology – especially in the Risk area – first evaluate, after that take actions! And I follow that. After I failed, i start to wonder maybe there is something wrong with Rita’s questions/answers, or I misunderstood everything. It is just unbelievable!
      Now, I am going to start everything over again and I am scare … I don’t know from where to start, because, as I said, I am really ready to swear that I answered every single question in the way I have studied and I have understood it.
      I am just lost….

      1. Hello Ivchi,

        What was your score in the exam, also what how was you scoring in mock tests. I am sorry to know that you have failed.

        But dont worry, you still have two attempts with you. Work hard, prepare well and pass the exam.

        I suggest you buy Head First PMP Book and read it from cover to cover.

  48. Hi Farhad,

    I am planning to prepare for PMP exam.

    Is there any eligibility criteria for enrolling for this exam, like one should have couple of years of experience as a project manager, is this mandatory.

    Also please suggest the books I should refer for preparation and approximate period we should prepare before giving exam.

    Thanks in Advance.

    1. As per my understanding you should have experience in project management activities, not necessarily as a project manager.

      Regarding the books, I suggest you go through head first, and kim heldman.

  49. Hello,

    I had failed in fist attempt just because I was below average in monitoring and controlling process.
    when I had applied for reexamination ,cant schedule the reexam because its says that eligibity ID is used ,what do I do ,do I need to resubmit the application though I have another 2 attempts and 6 months validity ,please advise

    1. You must contact the PMI customer care to solve the issue. I believe it might be some system error.

      You don’t have resubmit any new application.

      I hope you problem will be sorted out.

  50. Hello, I sat for the PMP this past saturday and I didnt pass. I read in your blog that you can see the areas of weaknesses on the report, but I only received a below proficient level notification. it didnt specify any particular area. Also, can you say if the exams are similar the same questions the second time?

    I know that my areas of weakness were the formula and critical path section so I am planning on concentrating on those two areas. I have to retake it within two weeks as my application is expiring.

    Can you please recomend a link of questions related to the formulas and ccm?

    thank you,
    Yanilka

    1. Hello Yanika, I am sorry to hear that you have failed in the exam. Anyway I hope you will be able to pass the exam in your next attempt.

      1) You can refer page 61 on the PMBOK Guide 5th edition, this page relates processes to the process groups and knowledge areas. From here you can find the knowledge area where you need to work harder.

      2) Here is the link for my post which explains the critical path method in great detail. You can clear your doubt from this post:

      https://pmstudycircle.com/2014/01/critical-path-method-cpm-in-project-management/

      3) Regarding the PMP Formulas, I have written an eBook on this topic. You can try this. Link is give below:

      https://pmstudycircle.com/pmp-formula-guide/

      Hope it helps.

  51. I failed in my first attempt, then I paid for second attempt but could not appear for the exam due to work in another country.
    What is my position now?
    I mine going to wait for another one year or I can re-apply immediately?
    If I re-apply now, what is the requirement and what is expected of me?
    How many attempt would they give me to try again – one or two slots?

    Thanks,
    Peter

    1. You applied for second time but did not appear. This will be considered as a failed attempt.

      Now you have one attempt left. If your one year eligibility period is balance, you can re-apply for the exam, otherwise you will have to wait for one year.

      Hope it helps.

  52. Help – I took the PMP exam twice in 2011 and failed. Work is now requiring a certification because of my level. I’ve studied HARD for it, and just failed AGAIN. I know the material inside and out. I feel it’s the questions, or perspective I’m taking. I’ve read the Rita book twice, PMBok once took a course in 2011 and took a on line course in the past month. Any advise since I’m expected to be certified by 6/30.

    Thank you!

  53. Hello,

    I failed in my first attempt at PMP, unfortunately my one year eligibility expired, should I wait for a year after my exam in order to apply again? I couldn’t see an explanation for such a case in PMI website.

    Thanks and Regards,
    Al

  54. hi Fahad,
    Your forums are always very helpful, thankyou.
    Please clarify as does there any difference in 1st and 2nd attempt weightage. If cleared in 2nd attempt will my collegues know about same or is it reflected any where in report/certificate?

    Regards,
    Sinha

    1. 1) There is no difference in 1st and 2nd attempt weightage.

      2) If you clear in your second attempt, your colleague will never know about it unless you tell them.

      3) This will only reflect in your PMI account from where you can download results of your all your previous attempts.

      Hope it helps.

  55. Hi,
    I want to give CAPM exam. In the application handbook , I saw that there were 3 attempts to give the exam in 1 year which is a similar case to PMP.

    Can you please clarify that if I fail in my first attempt, will I have to pay anything at all to go to the second attempt within that one year range?

    Please let me know. Thanks.

    Shyam

  56. Hello Fahad,

    I have failed in the first attempt and also my eligibility period of 1 year is over. How do i rescedule my PMP exam and what would it take to do so( in terms of money as well as application)
    thanks
    Manoj

    1. Since your eligibility period is expired, you must apply for a fresh application to PMI. Once your application approves, you can pay the full exam fee and schedule the exam.

  57. I took my pmp and failed. When i went through the first 10 Questions i was dumbstruck. All questions found to be new to me. I feel lost.

    I studied pmbok-1 time, head first -1 time and Rita – 3 times.

    I scored 70+ while i did rita and pmfast track simulation (2010 version) when i attended the exam I feel none of them looked similar as how i went through on mock test on rita or pm fast track.

    All found to be difficult.

    Now im scared to take up 2nd attempt

    I want to know how to study or start it again. I want to see or practice questions as similar like actual pmp exam. I want to break it up on my 2nd attempt in another 10 days.

    Let me know in detail how to get ready

    Do we have any sepearte blog, link for only problem Qns on cost and other mathematical problems?? I think im weak in this area.

    Also get confused on selecting options for conflict resolution/Opportunity-threat stragedy selection for mitigat/exploit/enhance

    1. Hello Prakash.

      I’m very sorry that you have failed the exam. But don’t be frightened, you still have two attempts left with you.

      Please do not schedule your exam within 10 days. Take at least one month for complete preparation.

      I see that you have studied the PMBOK Guide only once. Please re-read it as many times as you can.

      Review the books again and practice the questions.

      You can also subscribe to my blog and read A2Z Guide of PMP Exam.

      I hope you will pass the exam this time.

      Good luck on your exam.

        1. Wait until this information is updated into your account. Once it is updated, you will be able to schedule your next attempt.

    2. I 100% agree with you! I felt blind sided and feel like I have to completely start over with my studying! Nothing I studying before helped me on the exam.

Leave a Reply